| Before | After | ![]() | "
![]() | "
Handrail on stairs Installation of handrail for stairs |
![]() | "
![]() | "
Passageway Ceiling Installation of ceiling in passageway - loft hatch subsequently fitted in hole. |
![]() |
![]() |
Kitchen Floor Replacement of rotten joists under kitchen floor, and new floorboards |
![]() |
![]() |
Bathroom Refurbishment Complete refurbishment of bathroom, including removal of old bathroom, and fitting all new and tiling |
![]() |
![]() |
Cooker Extractor Hood Installation of cooker extractor hood, including non-standard 90-degree turn of chimney to route output to side wall. |
![]() |
![]() |
Wall repair and repainting Repair of wall, filling in cracks and repainting |
![]() |
![]() |
Flooring in hallway Laying of floor, using reclaimed flooring material. |
![]() |
![]() |
Cupboard 1 Replacement of cupboard in church kitchen |
![]() |
![]() |
Cupboard 2 Replacement of toy storage cupboard in church, replacing dangerous heavy lids |
![]() |
Bathroom Flooring and Basin Tiling on bathroom floor to match walls; Installation of bath panel; Replacement of existing wall-hung basin with vanity unit and new basin. Refreshed all sealant around bath, shower etc. |
|
![]() |
Kitchen Tiling Completion of tiling around hob and grouting of all kitchen tiles. |
|
![]() |
Bathroom Tiling Bumpy white tiles in a "brickwork" pattern, with a mosaic detail at dado height |
|
![]() |
Bookshelves Custom shelving to fit alcove. Routed detail on shelf edge and wall battens. |
|
![]() |
Floor Tiling Quarry tiles cut and laid in a pattern in utility room |
|
![]() |
Kitchen Tiling Tiling in a pseudo-random pattern Glass shelves fitted for glasses! |
|
![]() |
Mug rack Mug storage rack made to fit space in front of pipe box. Shelves have a rounded front edge. |
|
![]() |
Threshold Strip Link between kitchen and utility room floor. Oak threshold strip with rounded edges. |



























